EE&G Environmental Services, LLC (EE&G), holds a Microbial Remediation, Asbestos Removal, and Air Clearance Testing Project At The Markham Park – Fox Observatory, Sun

MIAMI, FL, August 01, 2019 /Neptune100/ — EE&G Environmental Services, LLC is one of the oldest firms in Florida. The history of EE&G spans decades of change and growth, evolving into their current structure, with the extension of Restoration Services, designed to better serve their clients. EE&G’s business has been solely focused on the environmental field since its inception, and they are currently considered one of the largest and most reputable Florida Headquartered Environmental Engineering, Remediation, Construction, and Disaster Response companies.

The company aims to provide cost-effective solutions to environmental and engineering concerns. This claim has been reiterated over the years and was recently substantiated as the company has been retained by Broward County Parks Department to conduct remediation of water-damaged drywall, removal of asbestos removal and abatement, post-remediation verification (PRV) and final clearance air testing.

EE&G Environmental Services, LLC (EE&G) was retained by Broward County Parks Department to conduct remediation of water-damaged drywall, removal of asbestos flooring, post-remediation verification (PRV) and final clearance air testing for combined microbial remediation and asbestos abatement project located at the Markham Park – Fox Observatory Sunrise, Florida.

EE&G removed and disposed of water and mold-damaged gypsum board walls and ceiling, micro cleaned all surfaces, treated damaged plywood with an anti-microbial coating, removed asbestos floor tile, conducted a PRV consisting of a visual inspection and collection of air cell samples and finally collected five air samples and completed analysis by Phase Contrast Microscopy (PCM). PCM is a method where the asbestos air cassette is analyzed by counting the fibers present in the cassette filter to determine if the levels are below the Environmental Protection Agency clearance level of 0.01 fibers per cubic centimeter (f/cc).

Clearance testing was conducted before the abatement containment was taken down to prevent the potential release of fibers in the air. Samples were analyzed by a third party laboratory using PCM in accordance with the National Institute of Occupational Safety and Health The process of asbestos clearance included visual inspection and air clearance testing. The visual inspection was used to see if the abatement contractor removed all of the materials that were requested. The results obtained by EE&G indicated the work area was cleared for re-occupancy.

The aim of the test is for combined microbial remediation and asbestos abatement project located at the Markham Park – Fox Observatory Sunrise, Florida.

More information about the restoration services offered by EE&G Environmental Services, LLC can be found on their website – https://www.eeandg.com/

Their network includes:

EE&G Environmental
EE&G Restore
EE&G Restore Atlanta
EE&G Duct Cleaners
EE&G Clean

EE&G has been around for a long time, with the company’s history spanning decades of change and growth, series of evolution and extension of Restoration Services to better serve their clients. The company primarily focuses on the environmental field and is currently considered as one of the largest and most reputable Florida Headquartered Environmental Engineering, Remediation, Construction, and Disaster Response companies.